Change Order Template

Construction Change Order Template: What to Include

A change order template only works if it captures everything both parties need to agree to before work proceeds. Most generic templates online miss the schedule impact field, or leave signatures as an afterthought — the two things most likely to matter in a dispute later.

What a real change order template needs

A usable template covers six things at minimum: a reference to the original contract, a clear description of the change, the cost impact (itemized, not a lump sum with no breakdown), the schedule impact, who requested the change, and signature lines for every party who needs to approve it.

The schedule impact field is the one most templates skip entirely, and it is often the one that matters most — a cost-neutral change that adds two weeks to the timeline still needs to be documented and agreed to in writing.

Where a static template breaks down

A single change order on a single job works fine as a PDF or Word template — fill it out, get it signed, file it. The problem shows up at scale: a company running several jobs with change orders moving through different approval stages on each one has no way to see, from a static template, which change orders are pending, which are approved, and which have been paid.

That visibility gap is exactly what turns into lost revenue — a signed change order that never gets invoiced because nobody tracked it against the budget.

From template to tracked record

The fix is not a better template — it is treating each change order as a tracked record instead of a filed document. A change order with a status (pending, approved, invoiced) and a direct link to the budget line it affects closes the gap a static form leaves open.

Related reading

See it in action

Turn a change order template into a tracked record.

Bloqbase tracks every change order — status, owner, cost impact — tied directly to your project budget. Book a demo with your own project data.

Request a demo
Construction Change Order Template: What to Include | BLOQBASE