AI savings calculator for construction Project Managers
Everyone assumes AI saves time on project management, but few have translated that into their own hours and euros. With your rate and how often you do six management tasks, this Excel does that math for you, every month.
Download resource
Enter your email and the download starts right away.
What's included
Who it's for
Between 20% and 30% of a project manager's time goes into management documentation: reports, minutes, follow-up emails. It's a figure that comes up in every sector study, but rarely does anyone translate it into the actual hours and euros of their own work.
This file captures six tasks a construction PM repeats week after week: the weekly status report, the coordination meeting minutes, the client update email, the budget deviation analysis, documenting a change order, and the project close-out report. Each task carries an estimated time, calculated with AI support and without it.
You only enter two figures: what your hour of work is worth and how often a month you do each task. The sheet calculates the rest automatically: hours recovered and their equivalent in euros, also projected to a year.
Of the six tasks, two don't depend only on writing fast: the budget deviation analysis needs the budget and what's been certified by hand, and the change order needs the exact takeoff for the affected line item. In Bloqbase both pieces of data live inside the project, so preparing those two documents starts from an already-loaded figure instead of an email asking the technical office for it.
The file is free, we just ask for an email to send it. If the number you get is more interesting than expected, get in touch and we'll review it together against your real project volume.
How to put it to work on a real project
The idea isn't to download another file and forget it in a folder. Use it with a specific case: a pending certificate, a coordination meeting, a cost overrun or a handover to the developer. Fill in the resource with real data from your project, validate the result with your own technical judgment, and keep it as an internal reference to repeat the process next time.