Health and safety plan on site: what it is and who approves it

Health and safety plan on site: who must write it, what it must develop compared to the project study and who approves it before starting.

What is the health and safety plan on site

The health and safety plan on site is the document with which the main contractor develops, for their specific way of executing the work, the prevention measures provided for in the health and safety study (or the basic study) written in the project. The requirement comes from Royal Decree 1627/1997, of October 24, which establishes minimum health and safety provisions for construction works in Spain.

It is not a generic document or a copy of the project study: the plan must adapt those provisions to the auxiliary means, machinery and actual execution system that the specific contractor executing the work will use.

Difference between the health and safety plan and the health and safety study

The health and safety study is written by the project technician, before bidding or awarding the work, and identifies foreseeable risks based on the project written. The health and safety plan is written by the awarded contractor, once they know how they will actually execute the work, and develops the study measures adapting them to their own work organization.

Confusing both documents is a common error: the study is for the project and prior to award, the plan is for execution and after it, each one responds to a different phase of the process.

Who must approve the health and safety plan

The plan must be approved before work begins by the health and safety coordinator during work execution, if this role is required in the specific project. When its appointment is not necessary, approval belongs to the supervising architect. In works for public administrations, approval belongs to the administration awarding the work, with prior report from the coordinator.

Beginning work without that explicit approval breaches Royal Decree 1627/1997, regardless of whether the plan is written and awaiting signature, approval is not a subsequent formality, it is a precondition to work start.

How the health and safety plan is modified during work

The plan can be modified by the contractor itself throughout execution, depending on how work evolves or incidents not foreseen when writing it. Any modification requires the same express approval from the coordinator or supervising architect required for the initial version, a change in preventive measures applied without that approval has the same legal problem as starting work without an approved plan.

In long works, it is common for the plan to be reviewed several times as different work phases succeed (foundation, structure, enclosures, installations), each with its own specific risks that the original plan may not have covered in the same level of detail.

How Bloqbase supports tracking the health and safety plan

Bloqbase can help keep visible what state the work's health and safety plan is in, written, pending approval, approved, under review for modification, and to preserve the history of approved versions along with the date of each approval.

The software does not write the plan or replace the approval of the health and safety coordinator or the supervising architect: that technical and legal responsibility continues to belong to whoever the regulations assign it to.

Also available inEspañolCatalàEuskara

Keep exploring

CAE in construction: responsibilities and documents

CAE in construction: responsibilities, documents and controls to coordinate companies and keep preventive information current on site.

Read

Safety and Health Coordinator on site

Safety and Health Coordinator on site: responsibilities, documents, and controls for coordinating companies and maintaining current preventive information on site.

Read

Estudio básico de seguridad y salud: cuándo es obligatorio

Cuándo corresponde un estudio básico o completo de seguridad y salud, qué criterios fija el RD 1627/1997 y qué comprobar si la obra carece de proyecto.

Read

Work site labor risk evaluation: methodology and example

Work site labor risk evaluation: how the severity and probability of each risk is assessed, and why it must be reviewed throughout execution.

Read

Safety nets for construction sites: types and regulations

Safety nets for construction sites: what systems exist (V, S, T, U), what regulations govern them, and when each should be used in collective protection.

Read

Safety signage on work site: types and regulations

Safety signage on work site: what Royal Decree 485/1997 requires, what types of signs exist and who is responsible for placing them before starting.

Read

See BLOQBASE in action on your own project.

Request a demo